Center for Computing & Data Sciences at BU
2023 Harleston Parker Medal
Finalist and Harleston Parker People’s Choice
Project name: Center for Computing & Data Sciences at BU
Project overview: Boston University’s Center for Computing & Data Sciences is a landmark for the university and for Boston. Built on a compact urban site as a vertical campus, it brings together 3000 students, faculty, and staff from departments that had previously been scattered around the university, giving them a collaborative, flexible environment for research, study, and teaching. The largest, sustainable, and operationally fossil fuel-free building in the city, the Center transforms the skyline, meets laudable sustainability goals, and prioritizes human-centered design and interconnectivity.
Project location: Boston, Massachusetts
Firm name: KPMB Architects
Completion: 2022
Client: Boston University
Jury comments: This is a truly monumental building designed to push the envelope in expression, sustainability and innovation. The jury appreciates the project and team’s ability to merge so many forward looking goals into a single edifice that will be a landmark project for decades to come.
Images/Photographer(s): Nic Lehoux, Tom Arban
MEP,IT: BR+A Consulting Engineers
Structural: Entuitive + LeMessurier Consultants
Building envelope: Entuitive
Cost: Turner & Townsend
Landscape: Richard Burck Associates Inc.
Lighting: Dot Dash
Climate engineering: Transsolar
LEED: The Green Engineer
Civil: Nitsch Engineering Inc
Elevator: Soberman Engineering
Fire and life safety, accessibility: Jensen Hughes
Geotechnical, geothermal: Haley & Aldrich
Acoustics/a.v.: Acentech
Environmental engineers: RWDI Inc
Façade access: Learch Bates
Hardware: Robbie McCabe Consulting
Food services: Ricca Design Studios
Signage: Entro Communications
Specifications: Brian Ballantyne Specifications
Construction management: Suffolk Construction
Owner’s project manager: Compass/Vertex